MMRDA
‘Metro projects will cause minimum inconvenience’
He has been a top official in the state environment department and has headed the Thane Municipal Corporation.
Girgaum chawl to be vacated for Metro 3 corridor
According to MMRC officials, the land may be utilised for ancillary operations and metro buildings.
Digging on metro 2B route for soil testing: MMRDA
The court asked the MMRDA to file a detailed reply in this regard by June 8 and posted the matter for hearing on June 12.
MMOPL reaches 400mn commuters
There are daily 378 to 382 daily trips on weekdays and the metro has covered more than 1.25 lakh trips.
Bids for monorail safety invited again amid poor response
The MMRDA had invited consultants to bid for this work, but nobody came forward.
JVPD: MMRDA testing soil sans BMC permission
A division bench of Justice Abhay Oka and Justice Riyaz Chagla on Tuesday asked whether the MMRDA had permission for soil testing.
Instead of 7, Monorail will now come in every 20 mins
The Mumbai Metropolitan Region Development Authority (MMRDA) had revised the rates recently.
MMRDA to directly purchase rail rakes
Authority takes decision in bid to open corridor soon.
Metro line extension project’s cost doubles
MMRDA has now pegged the cost to be Rs 6,607 crore.
MMRDA floats bid for 3 Metro line coaches
A total of 378 coaches will be required for the three metro lines.