About 5-6 acres of land to drill each well will be required and the duration of drilling will be 90-120 days per well.
27 Jun 2017 2:12 PM IST
Oil production for the all of 2016-17 is 2.5 per cent lower than 36.94 mt a year earlier.
25 April 2017 10:23 AM IST